Home
Our Works
Civil Construction
Pumping System
Service Center
Organogram
Electromecanics
ExperienceContact us

• Our Complete Work

• Jobs Under Execution

 Our Services at a Glance

• Electromechanics

• List of Equipments

• Grundfos::Better Pump

• Tube well Installation

• Forward of the CEO
• Contact us

  • 1. Work for 2 Nos. of 18 storied building superstructure being commenced at Lake City Concord, Khilkhet, Namapara.
  • 2. Commenced Drilling of Deep Tube Well of 700?-800? at MTC Cement Industries, Meghnaghat.
  • 3. Electromechanical Work at DHAKA SHERATON HOTEL Extension Project (2nd phase), Dhaka. Bidding for the electromechanical and fabrication jobs for the 3rd phase.
  • 4. Construction work and complete fabrication work for Ajker Kagoj bhaban at Dhanmondi. We were the lowest bidders and are therefore entitled to complete job, which includes construction work, fabrication work and electrical works. The construction job at the site has already been commenced.
  • 5. We have recently acquired the order for the complete fabrication job for Lake City Concord project. The Lake City Concord is a huge project that consists of 16 nos. of 18 storied buildings. Of these we are incharge of construction of superstructure of 2 nos. 18 storied buildings and were also awarded with the order for complete fabrication job. Due to huge size of the project and large work load we have made a temporary work shop at Lake City site and are carrying out the fabrication jobs from that work shop at site.
  • 6. Electrical wiring jobs at various high-rise building under Garden View Consortium, DDC etc. is under way.
  • 7. Drilling of 500? Deep Tube Well and installation of submersible pump at FANTASY KINGDOM, Dhaka.
  • 8. Drilling of 2nd Deep Tube Well at Sinha Textile Mills at Kachpur, Dhaka.
  • factory site for supply of portable water for consumption of 4000 employees and workers of the factory.
  • 10. Supply and Installation of Vacuum and Gas Pipeline at Sylhet Medical College, Sylhet.
  • 11. Installation and commissioning work of Grundfos brand Submersible pump at Opex Garments, Dhaka.
  • 12. Installation and commissioning work of Grundfos brand Submersible pump at Padma Textile Mills under Beximco Group.
  • 13. Installation and commissioning work of Grundfos brand Vertical Multistage Centrifugal pump at Dhaka Sheraton Hotel, Dhaka.
  • 14. Installation and Commissioning of Grundfos brand submersible pump for Deep Tube Well and horizontal single stage Centrifugal pump for water supply system of a 20-storied commercial building called Twin Tower at Dhaka city centre.
  • 15. Construction of complete Factory Building for Feng Dar Trade Industrial Co. Ltd?s Textile Mill.
  • 16. Construction of Equipment Base for Fantasy Kingdom project of Concord Group at Ashulia.
THE MEGATECH ENGINEERS
Head Office :
Road : 9/D, House : 32, Sector # 5,
Uttara Model Town, Dhaka-1230, Bangladesh
Sales :  +88 01711541257 , +88 01708524980,
Service : +88 016 2555 7606
Tel-Fax : 88 02 8913229
Email : admin@megatechengr.com, sales@megatechengr.com

Powerd by BD WEB DESIGN & DEVELOPMENT